The other concerns outlined in the complex project management approach that increase temporal complexity are related to the external environmental factors which can never be controlled and can be strong enough to de-stabilise the complete project
Tags: PROJECT MANAGEMENT CRITICAL ANALYSIS GRED PROJECT PPMP20014
The issue of climate change is a wicked problem and is investigated in the current climate change case study analysis with contribution from works of Udawatta, Zuo, Chiveralls and Zillante (2015) as well as from works of Jiazhe Sun and Yang (2016) and Whelton and Ballard (2002).
Tags: CLIMATE CHANGE CRITICAL ANALYSIS PROJECT MANAGEMENT WICKED PROBLEM PPMP20014
This project management assignment is aiming to address the complexity aspects of GERD dam case.
In the case of the GERD project, there has been a significant gap in evaluating the survey results as well as the execution of a survey plan done by the Bureau of the United States.
In this report the discussion on the complex characteristics of the GERD project and identification of the individual complexity factors of the project will be performed.
Tags: PROJECT MANAGEMENT PPMP20014