Timeline Evaluation Of The Project Feasibility Study Assignment

Question

Task: You are required to read the following case study and prepare a Project Feasibility Study and Timeline based on the information contained in the case study.

Assessment Description
This assessment is a case study regarding a Residential Duplex Development Project. In this case study you own a real estate development business with cash reserves for funding development projects of $800,000. Your current business project is to successfully complete, within a nine-month timeframe, a small residential development in a regional centre (a place that is not a suburb in a capital city) in the state in which you reside.

This will require you to locate:

  1. A regional centre in your state with a growing population that currently has more than 10,000 residents;
  2. A block of land for sale that is large enough to construct a duplex (two attached residences) based on the minimum land allotment size prescribed by the local council and that is selling for a price you can afford;
  3. A builder that will construct a duplex on your chosen block of land for a price you can afford.

Your primary objective is to create as much equity as possible (value of your constructed duplex less all project costs) and as much income as possible (rent collected from tenanted duplex less all holding costs).

Your assessment task is to prepare and submit a Project Feasibility Study and Project Timeline. Templates for both of these will be made available to you but you are welcome to modify them or use your own templates if you wish. You are expected to source real statistics and information rather than providing estimates. This can be achieved by conducting internet research of relevant websites and emailing or telephoning relevant people and organisations.

You will also be required to prepare an explanation supported by evidence of where you sourced each item of information in your assessment submission from. How you do this is entirely up to you.You may prepare a separate report based on each of the headings in the project feasibility study or You may include the information in your project feasibility study and project timeline as an appendix. Your explanation report cannot exceed 2,000 words and it must also include:

  • Constraints and goals
  • Macro-environment business drivers (such as economic, competitive, resourcing and
  • demographic factors taken into account when determining feasibility)
  • Micro-environment business drivers (such as technical /internal expertise, time pressures, and other people-related considerations)

Answer

Executive Summary
The completion of the feasibility study assignment had resulted in the identification of the factors that can form the impact on the usage of the works. The study had ensured the major alignment of the factors that can result in the enabling of the improved works. The project of residential complex had been dependent on the effective management of the processes. The study had ensured the factors that can provide the major factors integrating the involved development of the Residential Duplex Development Project. The identified timeline and feasibility study had also enabled the factors managing the cohesive management of the information. The timeline evaluation had be managed for easing the theory supporting the information aligning the integration of the works. The following assignment was a project feasibility study conducted for identifying the quantitative and qualitative study of the factors integrating the works for the improvement of the innovative formation of the works.

Introduction
The study of the feasibility study assignment is done for enabling the identification of the factors that align the completion of the effective and implied project management (Gan et al., 2017). The feasibility study involves the identification of the factors that can result in the effective growth and decline of the project. The study would ensure the major alignment of the factors that can result in the enabling of the improved works. The study would ensure the factors that can provide the major factors integrating the involved development of the Residential Duplex Development Project. The following assignment is a project feasibility study conducted for identifying the quantitative and qualitative study of the factors integrating the works for the improvement of the innovative formation of the works. The identification of the factors that can form the impact of the works in the project for developing the residential would be marked with the usage of the theoretical factors aligning the implication of the information.

Project Feasibility Study
The project feasibility analysis of the asset the executives would guarantee the factors that can shape the effect on the assessment of the residential duplex construction (Natan and Sumirat, 2019). The empowering of the data would guarantee the consummation of the powerful development of the residential duplex construction (Yang, and Jiang, 2019). The asset the executives can help in empowering the residential duplex construction for ensuring that the exercises are helped by the utilization of the factors dealing with the use of the residential duplex construction (Aran, Sirota and Butte, 2015). The project feasibility analysis of the alternate course of action development would guarantee the factors that can shape the effect on the assessment of the residential duplex construction. The empowering of the data would guarantee the fruition of the compelling development of the residential duplex construction. The alternate course of action development can help in empowering the residential duplex construction for ensuring that the exercises are helped by the utilization of the factors dealing with the use of the residential duplex construction. The project feasibility analysis of the change the board would guarantee the factors that can shape the effect on the assessment of the residential duplex construction. The empowering of the data would guarantee the consummation of the compelling development of the residential duplex construction (Badasyan, 2018). The change the board can help in empowering the residential duplex construction for ensuring that the exercises are helped by the utilization of the factors dealing with the use of the residential duplex construction.

Project Feasibility Study

1. Land Information

               

2. Purchase Information

Land Address:

94 Howe Street

Land Price:

$15,00,000

Suburb/Town:

Perth

Stamp Duty:

$25,000

Land Size:

2000 sqft

Conveyancing Fees:

$35,000

3. Local Council Information

4. Construction Information

Local Council Name:

BMT

Builder Name:

BMTQS

Minimum Land Allotment Size:

1000

Duplex Construction Costs:

$63,95,000

Development Planning Fees:

$15,000

                

Monthly Council Rates:

$30,000

5. Duplex Information

Duplex Estimated Value:

$45,00,000

Monthly Rental Income:

$40,00,000

Monthly Agent Fees:

$2,000

Monthly Landlord Insurance:

$3,000

6. Project Results

Equity Value =

Duplex Value of $4500000

less

Total Outgoings of $7970000

equals $-3470000

Net Monthly Rental Income =

Gross Monthly Rent of $4000000

less

Holding Costs of $35000

equals $3965000


Project Timeline of feasibility study assignment
Settlement Period on Land Purchase: The settlement period on the land purchase would showcase the factors for the enabling of the improved work function development. The easing of the works would be marked with the consideration of the effective strategy for the period evaluation of the land purchase development (Gan, Xu, Hu, and Wang, 2017). The enabling of the works would keep sure that the operations are very effective with the emancipation of the settled works. The land pricing would be marked with the conceptual development of the information.

Council
Development Approval: The approval for development on the council settlement would showcase the factors for the enabling of the improved work function development. The easing of the works would be marked with the consideration of the effective strategy for the period evaluation of the council settlement development (Jo et al., 2015). The enabling of the works would keep sure that the operations are very effective with the emancipation of the settled works. The council work approval would be marked with the conceptual development of the information.

Duplex Construction:
The time for the duplex construction would showcase the factors for the enabling of the improved work function development. The easing of the works would be marked with the consideration of the effective strategy for the period evaluation of the duplex construction development (Kim, Lee, and Moon, 2018). The enabling of the works would keep sure that the operations are very effective with the emancipation of the settled works. The complete construction of the residential duplex would be marked with the conceptual development of the information.

Main Steps and Milestones:
The main steps and milestones for the project are given below,

Project Timeline

                                                                             

 

Weeks

 

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

                                                                             

Settlement Period on Land Purchase

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                                                             

Council Development Approval

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                                                             

Duplex Construction

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Quantitative and Qualitative Risk Analysis performed in feasibility study assignment
The quantitative risk analysis is done based on the factors aligning the management of the works for the development of the Residential Duplex Development Project. The risk analysis would be based on the usage of the works defining the completion of the works (Anees et al., 2018). The integration would also enable the composition of the works to be used for the easing of the projects. The enabling of the facilities would ensure the risk evaluation based on the numbers and numeric value analysis. The development can also make sure that the factors managing the completion of the works can ease the easing of the factors. The identification of the risk analysis would ensure the usage of the factors aligning the development of the final outcomes.

The qualitative risk analysis is done dependent on the factors adjusting the administration of the works for the development of the Residential Duplex Development Project. The risk analysis would be founded on the utilization of the works characterizing the finish of the works. The combination would likewise empower the piece of the attempts to be utilized for the facilitating of the projects (Recalde, Aguilarand Galarza, 2016). The empowering of the offices would guarantee the risk assessment dependent on the non-numeric information worth analysis. The development can likewise ensure that the factors dealing with the finish of the works can facilitate the facilitating of the factors. The recognizable proof of the risk analysis would guarantee the use of the factors adjusting the development of the ultimate results.

Macro and Micro Environment (Pestle) Analysis The macro and micro environment analysis within this feasibility study assignment of the project of Residential Duplex Development Project would be done for the identification of the factors affecting the project. The customers (residents), quality analyst, and other stakeholder would act as the factors for micro environment. The demographic forces, political factors, technological factors, and economic forces would act as the macro factors (Natan and Sumirat, 2019). The involvement of each of the factors would be marked with the usage of the facilities and enduring the specific management of the works. The PESTLE analysis of the Residential Duplex Development Project is given below,

Political: The political components are the principle contemplations and expected a critical occupation and raise the standard of the concerned association business. The political factors will be highlighted by the pestle assessment. The political system is incredibly suitable for economic troubles and political course. The force of adaptability is as extraordinary to go up against a wide scope of goofs and recover all of the errors all around adequately (Dennis, Wixom and Roth, 2018). The condition of the political system is relentless so the aftereffect of the referenced association is invaluable for the country and the concerned association keeping up their business incredibly tranquil and productive. The workplace for the market which is refined and right condition limit (Aithal, 2017) .

Economic: The economic factor similarly huge and it is imperative to be highlighted. Because of the past factor, these couple of significant centers have been immediately depicted and something fundamentally the same as would happen in the economic factor (Luque,Ikromov and Noseworthy, 2019). The economic factor also fused a not many which are portrayed to understand the referenced assessment. Residential Project explored in this feasibility study assignment has couple of unprecedented contemplations and open entryways for capital improvement. A part of various segments like the cost are low for living and money exchange which is most critical for an enduring economy.

Social Factors: Few things which are joined into the social elements, for instance, advancement paces of the masses, compensation dissemination age, etc. Residential Project is absolutely okay for business purposes and socially particularly unique.

Technological: Technology and headway make everything less complex and trustworthy. The technological factors have some noteworthy point which makes the best business expects the customer. The latest technology and improvement started a discourse with the customer. The customer reliably gets destroyed in to innovative technology and Residential Project uses all the technological segments which are anything but difficult to use for the customer/inhabitants (McCabe et al., 2019).

Environmental: Residential Project's range is high because of a business and a fitting way. It allows each and every way which is possible to take forward in the business in a capable manner. The environmental factor of Residential Project is less difficult and less hard for cooperating.

Legal: Legal factor in like manner expect a critical activity and finished two or three ethics and benchmarks for Residential Project. There are accessible couple of political factors that are also based on some specific law like customer security law, antitrust law, business law, isolation law, and most huge law is prosperity and security law (Lin and Pan, 2016).

Conclusion and Recommendations
The completion of the feasibility study assignment had resulted in the identification of the factors that can form the impact on the usage of the works. The increment of the works can also enable the usage of the formative deployment of the works. The integration can also enable the usage of the factors easing the information developing the factors. The project of residential complex had been dependent on the effective management of the processes. The feasibility study assignment had also ensured that the use of the quantitative and qualitative risk assessment would ensure the identification of the evolvement strategies for marking the effective management of the effective and implied development of the information and system improvement for the project works. The identified timeline and feasibility study had also enabled the factors managing the cohesive management of the information. The timeline evaluation would be managed for easing the theory supporting the information aligning the integration of the works. Some recommendations for the completion of the project of construction are given below,
Resource Management: The introduction of the resource management would ensure the factors that can form the impact on the evaluation of the works. The enabling of the information would ensure the completion of the effective development of the works. The resource management can help in enabling the works for making sure that the activities are assisted by the use of the factors managing the usage of the works.
Contingency Plan Development: The introduction of the contingency plan development would ensure the factors that can form the impact on the evaluation of the works. The enabling of the information would ensure the completion of the effective development of the works. The contingency plan development can help in enabling the works for making sure that the activities are assisted by the use of the factors managing the usage of the works.
Change Management: The introduction of the change management would ensure the factors that can form the impact on the evaluation of the works. The enabling of the information would ensure the completion of the effective development of the works. The change management can help in enabling the works for making sure that the activities are assisted by the use of the factors managing the usage of the works.

Reference List
Aithal, P.S., 2017. An Effective Method of Developing Business Case Studies based on Company Analysis. International Journal of Engineering Research and Modern Education (IJERME), ISSN (Online), pp.2455-4200.

Anees, M., Hussain, S.M., Khan, K. and Abbas, A.T., 2018. 4 Factors Affecting the Need for Feasibility Analysis (For Local Construction Projects). Sir Syed Research Journal of Engineering & Technology, 8(1), pp.5-5.

Aran, D., Sirota, M. and Butte, A.J., 2015. Feasibility study assignment Systematic pan-cancer analysis of tumour purity. Nature communications, 6, p.8971.

Badasyan, N., 2018. Project feasibility analysis economic model for private investments in the renewable energy sector. Built Environment Project and Asset Management, 8(2), pp.215-230.

Bmtqs.com.au. (2019). Cost to Build a House | Building Costs Australia. [online] Available at: https://www.bmtqs.com.au/construction-cost-table [Accessed 25 Aug. 2019].

Dennis, A., Wixom, B.H. and Roth, R.M., 2018. Systems analysis and design. John wiley& sons.

Gan, L., Xu, D., Hu, L. and Wang, L., 2017. Economic feasibility analysis for renewable energy project using an integrated TFN–AHP–DEA approach on the basis of consumer utility. Energies, 10(12), p.2089.

Jo, H., Lee, H., Suh, Y., Kim, J. and Park, Y., 2015. A dynamic feasibility analysis of public investment projects: An integrated approach using system dynamics and agent-based modeling. International Journal of Project Management, 33(8), pp.1863-1876.

Kim, S., Lee, Y. and Moon, H.R., 2018. Siting criteria and feasibility analysis for PV power generation projects using road facilities. Renewable and Sustainable Energy Reviews, 81, pp.3061-3069.

Lin, Y. and Pan, W., 2016. Feasibility analysis of wood bioenergy on the current energy supply in Taiwan. Taiwan Journal of Forest Science, 31(3), pp.169-180.

Luque, J.P., Ikromov, N. and Noseworthy, W.B., 2019. Financial Feasibility Analysis: Planning for the Possible. In Affordable Housing Development (pp. 81-87). Springer, Cham.

McCabe, A., Fhailí, S.N.A., O’Sullivan, R., Brenner, M., Gannon, B., Ryan, J., Butt, A., Schull, M. and Wakai, A., 2019. Development and validation of a data dictionary for a feasibility analysis of emergency department key performance indicators. International journal of medical informatics, 126, pp.59-64.

Natan, O. and Sumirat, E.A., 2019, May. Investment Feasibility Analysis of a Coal Project Related to Improvement Production Capacity. In 1st International Conference on Economics, Business, Entrepreneurship, and Finance (ICEBEF 2018). Atlantis Press.

Recalde, A.A., Aguilar, C. and Galarza, L., 2016, September. Feasibility study assignment. Feasibility and stability analysis of a water transfer project on a subtransmission network. In 2016 IEEE PES Transmission & Distribution Conference and Exposition-Latin America (PES T&D-LA) (pp. 1-6). IEEE.

Yang, M. and Jiang, P., 2019. Improved Bayesian Causal Map Approach for Community-Based Product Design Project Feasibility Analysis. IEEE Transactions on Engineering Management.

NEXT SAMPLE

Related Samples

Question Bank

Looking for Your Assignment?

Search Assignment
Plagiarism free Assignment

FREE PARAPHRASING TOOL

PARAPHRASING TOOL
FREE PLAGIARISM CHECKER

FREE PLAGIARISM CHECKER

PLAGIARISM CHECKER
FREE PLAGIARISM CHECKER

FREE ESSAY TYPER TOOL

ESSAY TYPER
FREE WORD COUNT AND PAGE CALCULATOR

FREE WORD COUNT AND PAGE CALCULATOR

WORD PAGE COUNTER



AU ADDRESS
9/1 Pacific Highway, North Sydney, NSW, 2060
US ADDRESS
1 Vista Montana, San Jose, CA, 95134
ESCALATION EMAIL
support@totalassignment
help.com