(EMP6110) Environment management assignment for Bunbury outer ring WA to reduce environmental issues

Question

Task: Write an environment management assignment for a chosen project. Write about an issue using a sustainability framework and include a specific action to address the issue. Use environmental management tools and evaluate legislation and practises related to environment.

Answer

1 Context, scope and rationale for the environment management assignment
1.1 Proposal

Environment often plays an integral role in our life. In order to provide maximum protection to the environment, it is necessary to apply some environmental management plan. An environmental management plan is nothing but a set of rules and regulations helping in the mitigation process while monitoring the progress of eliminating environmental adverse causes or reducing them to some extent. My environment management assignmentis mainly based on Bunbury outer ring road construction process. This is a 27 km long road which is trying to link Forrest Highway and Bussel Highway. In western Australia in order to provide maximum advantage while travelling, construction of this road has been planned. The main proposal of the environment management assignmentis to plan an efficient EMP or environmental management plan which will help the commoner with the construction process of Bunbury Outer Ring Road (Palli, 2022). This environment management assignmentwill help to avoid congestion while travelling from one place to another. More freights will be able to travel as well. It will provide a more safe and more efficient route for tourists and passengers. In order to build this road, one needs to enhance the knowledge about the surrounding environment and then needs focus on a plan. This environment management assignmentplan will help to minimize all the relevant issues which comes in the way of the construction of Bunbury Outer Ring Road.

1.2 Key environmental factor/s considered for theenvironment management assignment
In Western Australia, Bunbury Outer Ring Road is connecting two important roads like Forrest Highway and Bussel Highway. There are a few key environmental factors which require more attention while constructing the road. The environmental management assignment plan should meet all the environmental policies decided by the government of Australia while constructing the road. At the same time, it is necessary to provide shelter to the wild animals roaming in that area. It is necessary to minimize the damage to the environment as much as possible while going through the construction. It is also necessary to abide by the compliance obligations during the process. The environment management assignmentplan needs to focus on meeting all the environmental objectives at the same time. Another key environmental factor is not disturbing the local biodiversity during the process. It is very important to preserve biodiversity as much as possible. The construction procedure should be energy efficient. Pollution should be managed so that it does not increase the number of pollutants in the environment. Resources should be used during the construction in an efficient way so that amount of waste gets reduced in a significant way.

1.3 Condition requirements for the environment management assignment
In order to achieve success while constructing Bunbury Outer Ring Road, it is important to meet all the condition requirements. The road will be built in the Western region of Australia and it is also important to look after all the conditions. The main requirement for the environment management assignmentis to comply with all the rules and legislations associated with the construction of Bunbury Outer Ring Road. Western Australian Environmental Protection Authority (EPA) was made for regulation under the State legislation or Environmental Protection Act 1986 and it will be thoroughly followed. At the same time, the Commonwealth Department of Agriculture, Water and Environment (DAWE) was made for evaluation, under Commonwealth legislation or Environment Protection and Biodiversity Conservation Act 1999. All the conditions mentioned here will be thoroughly followed in this Environmental management plan. The conditions of stakeholders and regulators in the environment management assignmentwill be thoroughly followed after assessment (Schuwirth et al., 2019). At the same time, the requirements of field inspections and biological surveys will be met while constructing a road. This is also necessary to follow and meet environmental impact assessments. State Wide Clearing Permit will be required during the construction procedure of this road linking Forrest Highway and Bussel Highway. The environment management assignment also needed to focus on other criteria of Environment management, vegetation clearing, revegetation and land sourcing.

1.4 Rationale and approach for the environment management assignment
This entire environment management assignmentis solely based on the construction of the linking road and the project is named Western Australia Bunbury outer ring road. As per the plan, this road is supposed to join Forrest road and Bussel road. This project is a 27 km long road which will help in transportation This was mainly done because previously, the traffic was a bit congested. It was quite difficult to pass more freights while the tourists try their best to avoid the road as well. 25 percent of construction is almost done. The environment management assignmentof making an environmental management plan is to conserve the surrounding environment. Due to the construction often the vegetation of that particular area may get ruined. In the meantime, often the biodiversity of that particular area may get disturbed. Also, the level of pollution may get increased in that locality. It may also happen that energy resources may get wasted simultaneously (Schuwirth et al., 2019). In order to achieve success while conserving the environment, this management plan is being made. The environment management assignmentplan will provide more knowledge on how to conserve the environment while building the road. The main approach is to save as much as vegetation and biodiversity as possible while constructing the linking road.

2 EMP Components
2.1 Factor

Activity

Management targets

Management actions

Monitoring

Timing / frequency of actions

Reporting

EPA Objective:

  1. The main objective of EPA is to protect the environment. Ground and surface wate will be protected as a part of nature’s resources. Another objective of the environment management assignmentis to provide protection to unexpected finds.
  2. To control the pollution and any harm to the environment. At the same time, vibration, noise, and dust will controlled.
  3. To find mitigation policies for the environment management assignment.
  4. To protect the vegetation and bio diversity. To provide more support and protection to local floral and fauna and vegetation.
  5. To protect aboriginal and non-aboriginal heritage of Western Australia and threatened species and communities falls under Commonwealth EPBC 1999 Act

 

  1. The management should target to provide the best assistance in order to save the environment. It is quite necessary in the environment management assignmentto target the points where one need to focus while trying to protect the environment.
  2. Management will target to keep the pollution in control. Also, it will be another target to keep pollution in check all the time (LelisRabeloAlbala et al., 2018).
  3. The main target of the management team will be to devise mitigation policies
  4. Another target for the management is to keep the bio diversity and vegetation of that particular area intact.
  5. The main target is to provide a shelter to the threated and aboriginal and non-original species and communities.

1.      All the legislation will be followed thoroughly. At the same time, activists will be contacted. Volunteers will be recruited. Less consumption of energy is required as well as resources.

  1. In order to control the pollution, managementent will keep track of the pollutants in the air and water. At the same time, they will try to use sustainable approaches of construction.
  2. Management will try to utilise more mitigation policies as per the governmnet guidelines. The management team will brainstorm and think about the most feasible and cost-effective mitigation process.
  3. The management will try to save the bio diversity and vegetation while not disturbing the environment. As per the environment management assignment they will try to provide protection and shelter to the animals. Technologies will be utilised to save the vegetation.
  4. As per the environment management assignment first they need to identify the endangered species and communities. Then they need to plan a thorough foolproof plan which will provide them shelter.

 

 

  1. the process will be monitored to see if the environment is being protected or not.
  2. They will try to monitor while engaging technology to measure the pollution.
  3. The success of the mitigation policies in the environment management assignmentwill be monitored while the team will show different feasible and cost-effective mitigation strategies (Policy, 2018).
  4. The count  of vegetation and bio diversity will keep in track while monitoring.
  5. The success while providing shelters to these communities and species will be monitored.

 

  1. It will be done once in the week basis.
  2. It will be done on an everyday basis to check the pollution.
  3. This will be done on monthly basis.
  4. This will also be done once in a month.
  5. It will be done once in six months.

 .

1.     Every report will go the environment protection team.

  1. This environment management assignment report will go to the team who are in charge of pollution control.
  2. Mitigation team will receive this reporting.
  3. This reporting will go to the environment protection team.
  4. It will be reported to the environment protection team as per the details in the environment management assignment.

 

3 Adaptive management and review of the EMP
Adaptive management simply means managing the resources in an adaptive nature while doing an assessment of the environment. "A deliberate approach to making choices and modifications in response to new information and alters in context," according to the definition of adaptive management. Adaptive management does not engage change of goals during implementation; somewhat, it means altering the route taken to reach the objectives in response to changes. It is found in this environment management assignment that adaptive management is basically a planned, stepwise method for making better decisions when everything is uncertain, with the objective of decreasing unpredictability over time through monitoring the system. Decision-making skills meet one or more objectives of managing resources while also gathering data required enhancing further management, either voluntarily or involuntarily. Adaptive management is a basic tool that is not for learning purposes as well as it cannot be used to change it. Adaptive management increases the analysis of performance for a long time because it is based on a basic learning process. The challenge in employing the adaptive governance framework is an achievement of the best short-duration outcome focused on recent knowledge while acquiring information to enhance administration in the long run. The application of adaptive coping strategies in the environment management assignmentcan be dated back to ancient societies. For hundreds of years, the Yap people of the land of Micronesia have used adaptive management strategies to maintain elevated levels of residents facing resource constraints. The Yap people have modified their atmosphere by using these strategies, constructing, for instance, in coastal areas mangrove depressions and seagrass fields in order to sustain fishing and insect pest-protective timber. The notion of adaptive management can be drafted back to Frederick Taylor's earlier 1900s ideas of scientific administration. Whereas the term "adaptive management" emerged in natural resources workshops as a result of stakeholders, directors, and researchers focusing on developing mathematical modelling to uncover basic factors and unpredictability. Wildlife preservation (SWAP, 2008), forest nature conservation (CMER, 2010), coastal restoration and maintenance (LACPR, 2009), genuine resource management (water, territory, and earth), species protection, particularly fish protection due to overfishing (FOS, 2007), and environmental degradation are some recent examples of adaptive management in preservation (DFG, 2010). In order to change and discover, adaptive management in a preservation or ecosystem nurturing project plan necessitates the integration of provided project/ design of the project, strategic planning, and surveilling. The three elements of adaptive management while doing environment related practice mentioned in the environment management assignment are: Evaluation of assertions entails methodically attempting additional functions in order to attain the desired success (Onyango et al., 2022). It is, even so, not a sample investigation procedure. Somewhat more, it entails selecting the best-known strategy based on experience with the particular site, putting out the inferences that underlie which process that technique will work, and then obtaining surveilling data to assess if the hypotheses are true. Alteration entails altering assumptions and approaches in response to new or various intelligence gathered through project management and experience. Learning entails describing a team's preparation and execution operations, as well as its achievements and disappointments, for interior as well as external learning. This knowledge imparted in the environment management assignmentpromotes conservation specialists to plan better ideas and oversee projects, avoiding some of the pitfalls that others have noticed. Comprehending about a controlled system is only helpful if management judgments are made repeatedly. Adaptive management is not limited to renewable source or ecosystem management; principles have been used in global development scripting. This has frequently been done to acknowledge the "evil" nature of many issues and challenges, as well as the limitations of a conventional strategic plans. This is reflected in strategies for global development. Adaptive management will try to provide the best measures for the project while trying to protect the environment of Western Australia.

The main target of the environment management assignmentplan is to protect the existing environment. At the same time, it is their duty to control pollution during the ongoing construction. Almost 25 percent work is done Now it is also important to protect the local vegetation and biodiversity. The management plan also tries to find a feasible and cost-effective mitigation plan. The management plan should target to provide the best assistance in order to save the environment. It is quite crucial to target the points where one needs to focus while trying to protect the environment. Management will target to keep the pollution in control. Also, it will be another target to keep pollution in check all the time. The main target of the environment management assignmentteam will be to devise mitigation policies. Another target for the management is to keep the biodiversity and vegetation of that particular area intact. All the legislation will be followed thoroughly. At the same time, activists will be contacted (Lao, and Subregion, 2021). Volunteers will be recruited. Less consumption of energy is required as well as resources. In order to control pollution, management will keep track of the pollutants in the air and water. At the same time, they will try to use sustainable approaches to construction. Management will try to utilise more mitigation policies as per the government guidelines. The management team will brainstorm and think about the most feasible and cost-effective mitigation process. The management will try to save biodiversity and vegetation while not disturbing the environment. They will try to enhance the environment using various sustainable methods. The construction will be done with ecologically sustainable products and procedures. They will try to provide protection and shelter to the animals. Technologies will be utilised to save the vegetation. The process of the environment management assignmentwill be monitored to see if the environment is being protected or not. It will be done once on a weekly basis. Every report will go to the environmental protection team. They will try to monitor while engaging technology to measure the pollution. There are various methods which can be utilised to construct the roads in an eco-friendly way. It will be done on an everyday basis to check the pollution. This report will go to the team who are in charge of pollution control. The success of the mitigation policies will be monitored while the team will show different feasible and cost-effective mitigation strategies. Various strategies can be utilized while looking for mitigation policies. Mitigation processes have to be safe for the environment. This will be done on monthly basis (Kaplan?Hallam, and Bennett, 2018). The mitigation team will receive this environment management assignment. The count of vegetation and biodiversity will keep track while monitoring. At the same time, they will be given protection along with proper shelter and food. Rehabilitation can be arranged for the vegetation and biodiversity in order to save them. This will also be done once a month. This reporting for the environment management assignmentwill go to the environment protection team. The environment protection team will take care of the animals and greens in Western Australia.

4 Stakeholder consultation for the environment management assignment
As per the environment management assignment findings, stakeholder consultation is quite important for any organisation. While constructing a road to link Forrest Highway and Bussel Highway, it is important to take some consultancy from the stakeholders. In Western Australia, in order to finish the project, various investors have tried to associate with the project while investing their money. In the meantime, Bunbury outer ring road requires a huge amount of investment. The Bunbury Outer Ring Road or BORR will provide substantial benefits to the province, including time savings, better safe driving, transport efficiency, and improved sea access. A large chunk of the development's $1.25 billion funding is being expended in the territory, creating more direct employment, and business ventures, and sponsoring the region's economy. So far, $160.3 million has been invested in businesses in the area to deliver BORR, with an additional $15.3 million spent in Aboriginal businesses, with numerous more opportunities available in the area. As per the definition of stakeholder consultation in the environment management assignment, the main two duties are gathering information required from the stakeholders in order to get their ideas and create awareness (Gómez, andMaynou, 2021). Awareness will be created so that other stakeholders may receive their chances to invest in this project. The main objective of stakeholder consultation is to specify a healthy relationship which will be based on mutual trust and will provide everyone with profit. Active listening skills and a proper understanding of the philosophies of associated stakeholders can help to shape and modify a company's overall projects. It is found in the environment management assignment that project-related or continuous consultation of stakeholders is possible. In various cases, a project-based discussion is used to create goods and services with new innovative approaches. A corporation, for instance, may counsel customers to determine the specific needs of the target market. Continuing consultation, on the other hand, is commonly used to track a company's progress in terms of desired outcomes and to maximise buy-in. For instance –, a corporation may seek advice from stockholders about changes to its direction or branding. Stakeholders can simply elaborate on the ideas of the environmental management plan. A different perspective can help to improve the approaches to the plan. With the financial help of the stakeholders, it will be quite easier to accept their decisions. They will try to invest their money while giving the plan their most precious pieces of knowledge. It will be quite impactful when the project will receive its success and connect both Forrest Highway and Bussel Highway (Assessment, 2018). Stakeholder consultation often may provide more insightful knowledge of the environmental management plan. It will eventually provide more data while devising a new idea on how to protect the environment. The environment is the most precious asset that needs to be protected while some construction is going on. When the road will be built, the construction may start pollution all over the place. In order to help the environment and save the vegetation and biodiversity of a particular area, it is quite important to discuss with the stakeholders. While taking any decisions for the environment management assignment, one needs to consult with the stakeholders for the betterment of their actions. It is quite necessary to discuss with them as they have invested their own share of money.

5 References
Assessment, M.F.S., 2018. ENVIRONMENTAL MANAGEMENT PLAN FOR PROPOSED SPECULATIVE 2D AND 3D SEISMIC SURVEYS OFF THE SOUTH AND WEST COAST OF SOUTH AFRICA.
Gómez, S. and Maynou, F., 2021. Balancing ecology, economy and culture in fisheries policy: Participatory research in the Western Mediterranean demersal fisheries management plan. Journal of Environmental Management, 291, p.112728.
Kaplan?Hallam, M. and Bennett, N.J., 2018. Adaptive social impact management for conservation and environmental management. Conservation Biology, 32(2), pp.304-314.
Lao, P.D.R. and Subregion, S.G.M., 2021. Environmental Management Plan.
LelisRabeloAlbala, P., Lorenzetti Lima, N.M., Cruz Noia, P.R.D., AuadProença, M., Soares Gonçalves, J.C. and ConsentinoKronkaMülfarth, R., 2018. The Environmental Management Plan at University of São Paulo: A Methodology for Sustainable Buildings Policy and Its Further Developments. In Towards Green Campus Operations (pp. 441-456). Springer, Cham.
Onyango, T.A., Okeyo-Owuor, J.B. and Odinde, D.N., 2022. Incorporating an Environmental Management Plan in Water Utilities Management Systems to Reduce Water Loss; Case of Non-Revenue Water in Kisumu City, Kenya. Journal of Applied Sciences and Environmental Management, 26(9), pp.1553-1556. Palli, V., 2022. Development and implementation of company's environmental management plan, regulatory requirements (Master's thesis, ???????????? ????????).
Policy, B., 2018. The Environmental Management Plan at University of São Paulo: A Methodology for Sustainable. Towards Green Campus Operations: Energy, Climate and Sustainable Development Initiatives at Universities, p.441.
Schuwirth, N., Borgwardt, F., Domisch, S., Friedrichs, M., Kattwinkel, M., Kneis, D., Kuemmerlen, M., Langhans, S.D., Martínez-López, J. and Vermeiren, P., 2019. How to make ecological models useful for environmental management. Ecological Modelling, 411, p.108784.
Schuwirth, N., Borgwardt, F., Domisch, S., Friedrichs, M., Kattwinkel, M., Kneis, D., Kuemmerlen, M., Langhans, S.D., Martínez-López, J. and Vermeiren, P., 2019. Environmental management plan for the establishment of a coral nursery project at ReethiFaru resort (Filaidhoo) in Raa atoll, Maldives.
Thaw, T.T., 2019. A STUDY ON IMPLEMENTATION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) IN BREWERY AND DISTILLERY INDUSTRIES IN YANGON REGION (Doctoral dissertation, MERAL Portal).

NEXT SAMPLE

Related Samples

Question Bank

Looking for Your Assignment?

Search Assignment
Plagiarism free Assignment

FREE PARAPHRASING TOOL

PARAPHRASING TOOL
FREE PLAGIARISM CHECKER

FREE PLAGIARISM CHECKER

PLAGIARISM CHECKER
FREE PLAGIARISM CHECKER

FREE ESSAY TYPER TOOL

ESSAY TYPER
FREE WORD COUNT AND PAGE CALCULATOR

FREE WORD COUNT AND PAGE CALCULATOR

WORD PAGE COUNTER



AU ADDRESS
9/1 Pacific Highway, North Sydney, NSW, 2060
US ADDRESS
1 Vista Montana, San Jose, CA, 95134
ESCALATION EMAIL
support@totalassignment
help.com